![]() If you claim 6G but rolled it out, the testing facility will know.Īgain, this is all ASME, and I can't promise AWS won't have different hoops to jump through.Īnd this is where my lack of knowledge is pretty evident. AWS (Structural Welding Code-Stainless Steel) Quick Review on Performance Qualification (References: AWS, Section 4 (Part B), Table, ,, ) 1- guide (Limitation of Variables) General Requirements: AWS, , Base Metal: Qualification on any one of materials, as shown in clause, shall be considered as qualification to weld any material permitted in this code. You only need proctors/witnesses that you followed the procedure you're testing/qualifying. Weld Procedure Qualification Testing and/or Welders Performance. AWS D17.1: Fusion Welding of Aerospace Applications. AWS D1.6: Structural Welding Code Stainless Steel. AWS D1.3: Structural Welding Code Sheet Steel. Actually, I welded my ASME IX re-qualification piece at my shop and shipped it for testing. AWS D1.2: Structural Welding Code Aluminium. That's what we're doing for ASME B31.1 and B31.3 stuff. Qualifying a procedure should not require you to test at their facility. pipe work, flat work, metal thickness, weld position, bevel, no bevel, backer/ or not, purge / or not, and an endless amount of other options. Based on what fillers it will cover and what parameters. You will essentially be making up your own weld test. I know there's a lot of paperwork and that you need to be knowledgeable about the code book. Slightly different scenario but same size effort needed. Believe Steve is working on setting up procedures for where he works. But I don't think there is a nut shell big enough. Poland308 wrote:Don't mean to sound like an ass.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |